8 Connect an Expander, If Required ..................... 47
8.1 Connecting the Q-bus Cables . ...................... 50
8.2 Connecting the DSSI Cable . . ...................... 51
8.3 Connecting the KZQSA External Cable . . ............. 52
8.4 Connecting the Power Control Bus Cable ............. 55
8.5 Connecting the Ground Cable ...................... 56
9 Connect the KZQSA Internal Cable, If Required .......... 56
10 Connect the DSSI Cable — Dual Host Only. ............. 59
11 Connect the Ground Cable — Dual Host Only ............ 62
12 Connect the System Power Cable...................... 64
13 Turn On the System and Select a Language ............. 66
14 Close the System Doors ............................. 69
15 After Installation .................................. 70
Appendix A Starting and Modifying VMS Factory-Installed
Software
A.1 Pre-Startup Requirements ........................... A–1
A.2 Startup Procedure . . . .............................. A–2
A.2.1 Modifying FIS for a Standalone System . . ............. A–3
A.2.2 Modifying FIS for a Simple VAXcluster Network . . . ..... A–7
A.2.3 Modifying FIS for a Complex Network or Dual-Host
System . . ...................................... A–11
A.2.3.1 Configuring for Dual-Host Systems . . . ............. A–12
A.2.3.2 Checking Your Modification Work ................. A–12
Index
Figures
1 Shipping Carton Contents ........................... 3
2 Sliding the System into Position ...................... 4
3 Lock and Key Positions ............................. 5
4 Opening the System Doors ........................... 6
5 Connecting a VT300-Series or VT400-Series Console Terminal 9
iv
Kommentare zu diesen Handbüchern